Construction work to stop traffic in Milford and Stratford on I-95 at night
The Connecticut Department of Transportation released an alert that traffic stoppages may occur on I-95 in Stratford and Milford as construction on Moses Wheeler Bridge continues.
Traffic may be stopped for ten minute intervals between 12:00 a.m. and 5:00 a.m. between exits 33 and 34. Construction workers are in the process of installing structural steel in the new bridge.
Last night I was traveling on I-95 Southbound around 10:00 p.m. and it took me about 50 minutes to travel between Milford and Fairfield; a ride that normally only takes about 15 or 20 minutes.
Traffic may be stopped for ten minute intervals between 12:00 a.m. and 5:00 a.m. between exits 33 and 34. Construction workers are in the process of installing structural steel in the new bridge.
Last night I was traveling on I-95 Southbound around 10:00 p.m. and it took me about 50 minutes to travel between Milford and Fairfield; a ride that normally only takes about 15 or 20 minutes.
Comments
Post a Comment